AF Responsible Space Operations

Plan the end of a mission as carefully as its beginning.

An aerospace programme under active development advancing mission-end planning, orbital-risk assessment and documented operational responsibility.

Explore the programme
Editorial space-engineering illustration of a small satellite above the curved Earth horizon.
Programme focusResponsibility across the mission lifecycle

Long-term responsibility depends on decisions made before mission end.

Space operations involve uncertainty in orbit information, changing mission conditions and decisions whose effects may persist beyond the useful life of a spacecraft. Disposal and passivation cannot be treated as isolated closing tasks if the design and operational concept do not support them.

The programme is developing structured assessment methods using reference mission scenarios and simulation. Mission-end choices, orbital information uncertainty and responsibility for engineering decisions are examined together to strengthen the quality of the resulting guidance.

Programme development priorities

  • Make mission-end assumptions, responsibilities and constraints explicit.
  • Examine risk and disposal options across a defined range of scenarios.
  • Document limitations and the evidence needed for further engineering or authorization decisions.

A structured approach to the question.

01Mission-end concept
Define the reference spacecraft, mission objective, operating context and end-state assumptions. Consider passivation, disposal planning and responsibility for records and decisions.
02Orbital-risk framework
Identify relevant debris and collision-risk considerations, data dependencies and uncertainty. Distinguish a technical scenario assessment from an operational warning or maneuver instruction.
03Scenario analysis
Explore nominal and degraded conditions, including limited resources or incomplete information. Compare options using consistent assumptions and clearly stated safety factors.
04Review and learning
Trace findings to assumptions, record unresolved questions and develop a checklist concept. Distinguish voluntary international guidance from binding requirements applicable to a real operator.
Technical frameworkConnected workstreams, interfaces and review evidence.
  1. 01Reference missionObjectives and operational assumptions
  2. 02End-state optionsPassivation and disposal concepts
  3. 03Risk scenariosUncertainty and degraded conditions
  4. 04Decision recordResponsibilities, limits and lessons

A simulated mission-end and orbital-risk assessment.

Mission-end development uses a reference small-satellite scenario with documented resource, orbit and information assumptions. The assessment compares nominal and degraded end-state options, passivation considerations and disposal-planning approaches. Scenario coverage, uncertainty and decision traceability define the evaluation—not operational maneuver instructions.

  1. Define the scenario

    Specify the assumed orbit context, spacecraft capability, remaining resources and information limits. Record the reference satellite parameters and the limits of the simulation.

  2. Compare options

    Examine nominal and degraded mission-end cases, passivation considerations and disposal alternatives within the stated assumptions. Record sensitivity and uncertainty.

  3. Review responsibility

    Check risk coverage, requirements traceability and the decision record. Identify matters requiring specialist engineering, operator action or jurisdiction-specific authorization before real use.

Development connects a defined application, measurable criteria and a traceable technical review.

Outputs and evaluation.

The development workstreams connect these deliverables to reviewable evidence and application-specific evaluation criteria.

  • Mission-end scenario description
  • Risk assessment framework
  • Disposal planning example
  • Operational checklist concept
  • Technical lessons-learned report
  • Suggested implementation guidance

Evaluation priorities

Risk coverage
Relevant nominal and degraded cases are considered without hiding unresolved hazards.
Assumption consistency
Inputs, uncertainty and limitations are carried through the assessment.
Traceable decisions
Each conclusion has a documented basis, responsible decision context and clear limit on use.

The right expertise. Clear responsibilities.

The participation framework connects mission design, space-safety research, orbital analysis and information-governance expertise. Contributions are assessed against the mission-end question, the assumptions and the evidence required for review.

Scope and safeguards

Assessment methods support competent mission and operator decisions. Operational maneuver advice, collision-warning services and regulatory determinations have their own responsible authorities and service arrangements.

International guidance and jurisdiction-specific obligations are assessed separately. Real mission activities require the responsible operator to establish applicable requirements, permissions and competent technical review.

Participation and technical decisions remain separate.

Participation does not automatically confer membership rights, AF Recognition, accreditation, certification, standards-setting authority or procurement preference. Sponsorship must not determine technical conclusions, evaluation results or governance decisions.

Development, grounded in evidence.

Technical objectives, responsible coordination and application needs shape the development process. Resources, safety, confidentiality, data protection, intellectual property and reporting arrangements are reviewed alongside the methods and deliverables, keeping progress focused and accountable.

A structured development pathwayExplore the seven connected development stages

Programme development connects technical requirements, responsible coordination and reviewable evidence. Each stage informs the next, while review findings refine the scope, methods and priorities.

  1. Requirements & Objectives

    Define the technical problem, user need and scope.

  2. Feasibility & Evidence

    Examine methods, resources, interfaces and dependencies.

  3. Scope & Responsibilities

    Align workstreams, coordination and review arrangements.

  4. Pilot Development

    Connect the evaluation plan to funding, safety, data and intellectual-property controls.

  5. Controlled Implementation

    Maintain the agreed technical boundary and responsible delivery arrangements.

  6. Technical Evaluation

    Review evidence and outcomes against application-specific criteria.

  7. Knowledge & Further Development

    Translate reviewed findings into useful outputs and the next development priorities.

Bring your expertise into the programme.

Introduce a mission-end question or assessment method and describe the expertise you can contribute. Time-critical operational issues belong with the relevant operator and authorized service channels.