Accreditation
Aircraft Maintenance and Technical Services
Follow facility, aircraft type and task capability through current technical data, parts history, human factors, task execution and handover. A maintenance scope does not automatically cover every internal test or training activity.
Programme overview
Scope first.
Evidence throughout.
Follow facility, aircraft type and task capability through current technical data, parts history, human factors, task execution and handover. A maintenance scope does not automatically cover every internal test or training activity.
Technical scope
Subjects within this family.
The profile retains 7 technical subjects. Inclusion here describes the framework; an individual grant covers only the specifically assessed and approved scope.
- F06-M01Line maintenance
- F06-M02Base maintenance
- F06-M03Engine and APU services
- F06-M04Component maintenance
- F06-M05Structures, cabin and modification embodiment
- F06-M06Technical asset support
- F06-M07Storage, preservation and end of life
Evidence & assessment
Connect the claim to actual capability.
Read the family profile with the common ASTRA standard. Application-specific criteria, local authority and real evidence must be established for the particular case.
Define the object
Identify the legal holder, actual performer, subject or configuration, site, operating conditions and requested outcome.
Demonstrate implementation
Connect applicable requirements to current personnel, methods, resources and traceable original records. Confirm that reused evidence is relevant to this scope.
Resolve the conclusion
Every applicable mandatory condition must pass, exclusions must be independently justified and in-scope nonconformities verified closed before a positive decision.
Outcome boundaries
Use the conclusion actually reached.
Maintenance capability is bounded by facility, aircraft type and task. It does not confer repair-design authority, a personal licence or automatic accreditation of internal laboratory and training activities.
Membership, commercial relationships and a completed application do not determine the technical decision. Separate legal and competent-authority requirements continue to apply.
Controlled references
Programme documents.
Read the common core and this family’s profile together. These resources remain in the dedicated ASTRA collection, not the general Documents library.
First Edition / 30 September 2026. This is the publication date, not an individual approval or effective date. Technical adoption, operator authority and scope activation require their own authentic records.
Your next step
Make the requested scope clear.
Describe the programme family and the actual work for initial scope review. Availability and the appropriate outcome are confirmed for the specific request; submission is not approval.