Skip to content
Aerospace Federation

Aerospace Federation

Find your direction.

Explore the Federation. Connect with its work.
Federation sections6 areas

Choose an area to see its pages. Shortcuts are in Quick access.

Applied Aerospace InitiativeActive Development

AF Sustainable Airports Partnership

A measurable improvement starts with a bounded airport process.

An aerospace programme under active development connecting airport and ground-operation improvement with measurable resource use, operational feasibility and safety.

Explore the programme
Editorial illustration of an unbranded electric ground-support tractor and charging point on an airport apron.
Programme focusGround operations, measured in context

Compare performance without losing the operating context.

Airport activity changes with traffic, weather, schedules and equipment availability. A reduction in total consumption does not by itself show a more efficient process, while an apparently lower-impact technology may introduce charging, availability or safety constraints.

Development is organized around a specific airport process and a defensible baseline. The collaboration framework connects operational knowledge, equipment performance and environmental analysis so that an improvement can be judged in the context of the task it needs to perform.

Programme development priorities

  • Define a process boundary and a relevant unit of activity.
  • Compare an improvement scenario with the baseline using documented assumptions.
  • Examine operational feasibility and safety alongside environmental performance.

A structured approach to the question.

01Process and baseline
Map the activity, equipment, duty cycle and data sources. Define suitable normalization, such as a task or operating-hour basis, and record seasonal or operational variation.
02Resource and emissions picture
Assess energy, water, waste, air-quality or ground-operation noise questions within the chosen scope. Emissions inventories use documented factors and consistent boundaries.
03Improvement scenario
Examine options such as ground-support equipment electrification, scheduling changes or resource controls. Consider infrastructure, charging, equipment availability, maintenance and cost assumptions.
04Comparative evaluation
Compare like-for-like activity and document uncertainty. Test whether an option remains workable during peak demand and within the responsible operator’s safety constraints.
Technical frameworkConnected workstreams, interfaces and review evidence.
  1. 01Ground processTask, duty cycle and safety boundary
  2. 02Measured baselineEnergy, resources and activity units
  3. 03Improvement scenarioInfrastructure and availability
  4. 04Comparative reviewPerformance, cost and feasibility

A bounded ground-support equipment improvement study.

The ground-support development framework compares a representative duty cycle with an electrified equipment scenario. It examines charging demand, infrastructure, resource use, equipment availability and operating conditions using a consistent activity boundary. Sensitivity analysis tests whether the comparison remains useful as utilization and energy assumptions change.

  1. Establish the baseline

    Define the task, fleet boundary, activity unit, data quality and operating assumptions. Separate measured information from estimates.

  2. Develop the scenario

    Assess charging windows, infrastructure, equipment availability, maintenance and a documented emissions-calculation approach.

  3. Test the comparison

    Review sensitivity to utilization and energy assumptions. Address safety permissions and operational questions as part of demonstration planning.

Development connects a defined application, measurable criteria and a traceable technical review.

Outputs and evaluation.

The development workstreams connect these deliverables to reviewable evidence and application-specific evaluation criteria.

  • Operational process map
  • Baseline measurement plan
  • Environmental performance indicators
  • Improvement concept
  • Comparative evaluation method
  • Technical findings report

Evaluation priorities

Normalized performance
Resource use and documented emissions per relevant activity unit, not unsupported aggregate savings.
Operational availability
The scenario can meet the defined task, duty cycle and resilience needs.
Feasibility
Infrastructure, cost assumptions, safety constraints and data limitations are explicitly assessed.

The right expertise. Clear responsibilities.

The collaboration framework defines roles for airport-process specialists, ground handlers, equipment engineers, resource analysts and information users. Contributions are organized around the selected operating process and the evidence needed to assess it.

Scope and safeguards

Airport demonstrations require the responsible operator’s permission, airside controls, competent safety review and applicable authorizations. Safety, security and operational continuity are integral to the development approach.

Environmental and cost comparisons depend on a defined boundary, credible inputs and transparent assumptions. Supplier selection and operator endorsement remain independent decisions.

Participation and technical decisions remain separate.

Participation does not automatically confer membership rights, AF Recognition, accreditation, certification, standards-setting authority or procurement preference. Sponsorship must not determine technical conclusions, evaluation results or governance decisions.

Development, grounded in evidence.

Technical objectives, responsible coordination and application needs shape the development process. Resources, safety, confidentiality, data protection, intellectual property and reporting arrangements are reviewed alongside the methods and deliverables, keeping progress focused and accountable.

A structured development pathwayExplore the seven connected development stages

Programme development connects technical requirements, responsible coordination and reviewable evidence. Each stage informs the next, while review findings refine the scope, methods and priorities.

  1. Requirements & Objectives

    Define the technical problem, user need and scope.

  2. Feasibility & Evidence

    Examine methods, resources, interfaces and dependencies.

  3. Scope & Responsibilities

    Align workstreams, coordination and review arrangements.

  4. Pilot Development

    Connect the evaluation plan to funding, safety, data and intellectual-property controls.

  5. Controlled Implementation

    Maintain the agreed technical boundary and responsible delivery arrangements.

  6. Technical Evaluation

    Review evidence and outcomes against application-specific criteria.

  7. Knowledge & Further Development

    Translate reviewed findings into useful outputs and the next development priorities.

Bring your expertise into the programme.

Introduce a ground-operation process, its activity unit and the improvement question. Share a non-sensitive overview without security-related airport layouts or operational access information.

Contact the FederationBack to Applied aerospace